Life Cycle Cost Model for Mobile Electric Power.

Abstract

This report contains the Users Guide to the Life Cycle Cost Model developed for Mobile Electric Power. The model was developed using SYMPHONY software and follows the Army 5 Phase Cost Methodology. Appendix A contains the Variable Input Sheets fo each cost Element in the model and Appendix B describes the menu tree structure of the model. The model is based upon the most widely used approach to costing the specific type of systems developed at Belvoir Research Development and Engineering Center. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 29, 1986
Accession Number
ADA172019

Entities

People

  • Christopher Ford
  • John Steinbock
  • Victoria Young

Organizations

  • Leidos

Tags

Communities of Interest

  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Attrition
  • Computers
  • Contractors
  • Cost Analysis
  • Electric Power
  • Fabrication
  • Maintenance
  • Maintenance Personnel
  • Manufacturing
  • Military Personnel
  • Personnel Management
  • Production Engineering
  • Quality Control
  • Supply Chain Management
  • Test And Evaluation
  • Test Equipment
  • Training

Readers

  • Database Systems and Applications
  • Energy Conservation and Renewable Energy Engineering.
  • Life Cycle Cost Analysis