Contractor Evaluation Report for Tactical Interface System.
Abstract
The Acceptance Test for the Tactical Interface System (TIS) was held on 6-7 December 1982 at Fort Sill, Oklahoma. The Support System Interface Module (SSIM) and the TIS software executing on the VAX-11/780 were functionally tested in accordance with the approved Acceptance Test Plan for Tactical Interface System, 5 November 1982. The purpose of the test was to verify that the hardware and software met the requirement detailed in the Computer Program Development Specification of 31 July 1982. As per Attachment A to DI-T-1904 of the contract, the compilation and assembly of selected TACFIRE modules and system generation of the TACFIRE system were performed as part of the test. The results of the test are that a bare bones PSS system was successfully generated. This system loaded and functioned correctly. This document contains the test procedures and observed results of the Acceptance Test.
Document Details
- Document Type
- Technical Report
- Publication Date
- Feb 28, 1983
- Accession Number
- ADA173428