Feasibility Study of Coal Gasification/Fuel Cell/Cogeneration Project, Fort Greely, Alaska Site. Preliminary Survey,

Abstract

The purpose of this report is to present the results of the preliminary survey of the Fort Greely, Alaska site proposed for a Coal Gasification/Fuel Cell/Cogneration (GFC) system. The site characteristics that could effect the feasibility of a GFC installation are discussed as well as existing methods for generating and distributing thermal and electric energy.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 02, 1985
Accession Number
ADA173684

Entities

People

  • C. Trapp
  • P. Estreich

Organizations

  • Ebasco Services

Tags

Communities of Interest

  • Energy and Power Technologies
  • Weapons Technologies

DTIC Thesaurus Topics

  • Active Duty
  • Air Force
  • Air Pollution
  • Construction
  • Department Of Defense
  • Electric Generators
  • Energy
  • Energy Systems
  • Fuel Cells
  • Fuels
  • Gases
  • Generators
  • Hot Water
  • Marine Corps
  • Materials
  • Standby Equipment
  • United States

Readers

  • Geotechnical Engineering.
  • Military Logistics and Supply Chain Management
  • Military/Explosive Ordnance Disposal (EOD) Technology

Technology Areas

  • Biotechnology
  • Biotechnology - Bioremediation