Computerized Cost Optimization Scheduling.

Abstract

The scheduling of projects is a vital function for those in the construction industry. Any scheduling strategy that provides a means for reducing project costs is of interest to a contractor. Performing cost optimization scheduling can provide contractors with this valuable management information. Utilizing the abilities of the computer enhances the information process. The purpose of this master's report is to present the concepts concerning cost optimization scheduling and a computerized optimization program that was developed. Keywords: Time cost trade offs; CRASH computer program. (Author)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 21, 1986
Accession Number
ADA175137

Entities

People

  • Mark A. Roncoli

Tags

Communities of Interest

  • Human Systems

DTIC Thesaurus Topics

  • Case Studies
  • Commerce
  • Compression
  • Computer Languages
  • Computer Programs
  • Computers
  • Construction
  • Contractors
  • Critical Path Methods
  • Engineering
  • Engineers
  • Hard Copy
  • Indirect Costs
  • New York
  • Optimization
  • United States
  • User Friendly

Readers

  • Life Cycle Cost Analysis
  • Systems Analysis and Design