Two-Year Summary of Fort Irwin, California, Family Housing Comparison Test: Operation and Maintenance Costs of Manufactured Verses Conventionally Built Units.
Abstract
Congress directed the construction of 200 units of manufactured/factory-built housing at Fort Irwin, CA, in 1982 to see if this method of construction will cost less than conventional housing, yet still provide durable housing commensurate with contemporary housing standards. Congress directed the Department of Defense (DOD) to conduct a fair and reliable study that will compare the operation and maintenance (O&M) costs of manufactured housing to those of conventional housing. DOD will report to Congressional committees on the conditions and parameters under which this test was conducted and the results of the test after it is completed in FY88. To compare these two types of construction properly, DOD must be able to reliably identify O&M costs and user satisfaction. In addition, it must be able to identify differences in O&M costs and the reasons for those differences. This is the second of four interim reports on the progress of the study. USA-CERL will provide a yearly summary for each of FY84-FY87. A final report covering the first 5 years of O&M costs will be written at the end of FY88. No conclusions or inferences should be made as to which type of construction was lowest cost until the final 5-year summary is complete.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1986
- Accession Number
- ADA175995
Entities
People
- Robert D. Neathammer
Organizations
- Construction Engineering Research Laboratory