Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1. Chanute Air Force Base, Rantoul, Illinois. Volume 1.

Abstract

A problem confirmation study was performed at seven sites on Chanute AFB identified in the Phase I investigation as requiring further study (Fire Training Areas 1 and 2, Landfill Nos. 1,2,3 and 4, and Building 932 Fuel Oil Storage Area). The field investigation was conducted from October 1984 to June 1985 and included the installation of 25 monitor wells, collection and analysis of groundwater samples from monitor wells, and collection and analysis of soil samples from the Building 932 Area. Analytes include VOA, TOC, TDS, Oil and Grease, EP Toxicity, Ignitibility, Xylene, Phenol, Chromium, 2,4-D and 2,4,5-TP. Based on the hydro-geologic complexity of the physical setting and findings of the sampling and analytical work, follow-on investigations have been recommended at all seven sites.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Oct 01, 1986
Accession Number
ADA177113

Entities

People

  • Harry M. Ricketts
  • Jack E. Dowden
  • Katherine Sheedy

Organizations

  • Weston Solutions (United States)

Tags

Communities of Interest

  • Biomedical
  • Ground and Sea Platforms
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Chemical Synthesis
  • Chemistry
  • Ecology
  • Environmental Health
  • Environmental Protection
  • Geography
  • Geotechnical Engineering
  • Groundwater
  • Measurement
  • Organic Compounds
  • Topography
  • United States
  • Volatile Organic Compounds
  • Waste Disposal Facilities
  • Water Resources
  • Water Supplies

Readers

  • Environmental Remediation and Restoration.