A Detailed Description of the National Training Center Instrumentation System Initialization Procedure
Abstract
This report presents a detailed description of the Instrumentation System Initialization Procedure that occurs at the start of each National Training Center (NTC) training unit rotation. The NTC Initialization Procedure is the process that links the identifying data elements for each instrumented player. This linkage is necessary both for the operation of the NTC instrumentation system pooling, as well as subsequent analysis of NTC data for research purposes. The description provided in this document of the Initialization Procedures has been written at a management level. Thus, it will be most useful to NTC personnel with management responsibilities or to members of the research community who require a broad understanding of how NTC data is collected. Readers must, therefore, have a general understanding of the NTC to fully benefit from this report.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1987
- Accession Number
- ADA180161
Entities
People
- T. J. Ritenour
Organizations
- Braddock Dunn & McDonald