Software Cost Estimation Study.

Abstract

The effort described in this report focuses upon the following three areas addressed in Task III: 1) The collection of current AVIONICS data and subsequent derivation of preliminary CER (Cost Estimating Relationship) prototypes for ultimately calibrating the SASET model parameters. This includes the generation of SASET productivity factors and complexity multipliers; 2) The categorization and organization of functional sizing data for formulating a suitable AVIONICS data base. This AVIONICS data base will be utilized in the SASET model in generating cost and schedule outputs; and 3) The calibration of the SASET model AVIONICS data base to ensure verification and validation of all SASET model parameters. In this respect, a total review of all SASET model requirements has begun. The intent is to update the SASET REQUIREMENTS document within the next quarterly reporting period.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1987
Accession Number
ADA180206

Entities

People

  • Aaron N. Silver
  • William G. Cheadle

Organizations

  • Martin Marietta

Tags

Communities of Interest

  • C4I
  • Energy and Power Technologies
  • Materials and Manufacturing Processes
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Application Software
  • Assembly Languages
  • Computers
  • Data Analysis
  • Data Reduction
  • Databases
  • Information Science
  • Language
  • Models
  • Operating Systems
  • Plastic Explosives
  • Prototypes
  • Regression Analysis
  • Resource Management
  • Simulations
  • Software Development
  • Software Prototyping

Readers

  • Ballistic Missile Meteorology
  • Life Cycle Cost Analysis
  • Software Engineering