Software Cost Estimation Study.
Abstract
The effort described in this report focuses upon the following three areas addressed in Task III: 1) The collection of current AVIONICS data and subsequent derivation of preliminary CER (Cost Estimating Relationship) prototypes for ultimately calibrating the SASET model parameters. This includes the generation of SASET productivity factors and complexity multipliers; 2) The categorization and organization of functional sizing data for formulating a suitable AVIONICS data base. This AVIONICS data base will be utilized in the SASET model in generating cost and schedule outputs; and 3) The calibration of the SASET model AVIONICS data base to ensure verification and validation of all SASET model parameters. In this respect, a total review of all SASET model requirements has begun. The intent is to update the SASET REQUIREMENTS document within the next quarterly reporting period.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1987
- Accession Number
- ADA180206
Entities
People
- Aaron N. Silver
- William G. Cheadle
Organizations
- Martin Marietta