Construction Quality Assurance Plan for the East Coast Air Combat Maneuvering Range Offshore Kitty Hawk, North Carolina.

Abstract

The development of the East Coast Air Combat Maneuvering Range, offshore Kitty Hawk, North Carolina entails the fabrication, transportation and installation of four ocean structures which, with electronic gear comprise a portion of the Range. During the construction phase of the project, responsibility for quality control rests with the Construction Contractor while responsibility for Quality Assurance rests with the Government. Set forth hereinafter is the A&E's plan for supporting the Government in their quality assurance efforts.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1977
Accession Number
ADA182560

Tags

Communities of Interest

  • Biomedical
  • Counter WMD
  • Human Systems

DTIC Thesaurus Topics

  • Alloys
  • Analytical Chemistry
  • Chemical Analysis
  • Chemistry
  • Construction
  • Contractors
  • Elements
  • Engineering
  • Engineers
  • Fabrication
  • Materials
  • Materials Testing
  • North Carolina
  • Quality Control
  • Stainless Steel
  • Tensile Strength
  • Test And Evaluation

Readers

  • Aerospace logistics and air mobility.
  • Maritime Security/Maritime Homeland Security
  • Software Engineering

Technology Areas

  • Microelectronics