Integrated Information Support System (IISS). Volume 8. User Interface Subsystem. Part 12. Virtual Terminal Unit Test Plan.

Abstract

This unit test plan establishes the methodology and procedures used to adequately test the capabilities of the computer program identified as the Virtual Terminal (VT). The VT translates between VT commands and commands for a particular type of terminal. Part of the VT handles sending and receiving messages across the NTM. Another part interfaces with the terminal specific device driver.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 01, 1985
Accession Number
ADA182580

Entities

People

  • Al Wehrman
  • Carol Morenc
  • Penny Robie

Organizations

  • General Electric

Tags

Communities of Interest

  • Air Platforms
  • Space

DTIC Thesaurus Topics

  • Air Force
  • Aircrafts
  • Application Software
  • Computer Programming
  • Computer Programs
  • Computers
  • Contractors
  • Contracts
  • Device Drivers
  • Military Aircraft
  • Operating Systems
  • Standards
  • Test And Evaluation
  • Test Beds
  • Test Methods
  • User Interface
  • User Manuals

Readers

  • Computer Science/Computer Engineering/Data Science/Digital Signal Processing.
  • Software Engineering