Robustness in Cost Performance Models.

Abstract

This thesis examined the robustness of methods used to compute estimates at completion of contract costs. The four techniques examined were a subset of those used by the Cost Performance Report Analysis computer program to derive estimates at completion. Monte Carlo simulation methods were used to generate the required data values for 18 simulated populations representing a variety of possible cost and schedule overrun scenarios. A statistical evaluation of the robustness of the four estimate at completion techniques was performed using samples from each of the 18 simulated populations. The results of this analysis indicate that, for practical purposes, none of the selected estimate at completion techniques are robust for the cost and schedule overrun scenarios that were investigated. The tendency of each of the estimate at completion models was to underestimate the final contract cost. The estimate at completion models incorporating mathematical smoothing techniques (i.e., weightings or moving averages) provided relatively stable results across all of the populations; however, they were unable to consistently predict a contract's completion cost within 30 percent of the actual value.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1987
Accession Number
ADA187183

Entities

People

  • Darren E. Morgan

Organizations

  • Air Force Institute of Technology

Tags

Communities of Interest

  • Space

DTIC Thesaurus Topics

  • Abstracts
  • Acquisition
  • Air Force
  • Computer Programs
  • Computers
  • Contracts
  • Control Systems
  • Cost Overruns
  • Databases
  • Department Of Defense
  • Governments
  • Information Science
  • Literature Surveys
  • Monte Carlo Method
  • Simulations
  • Statistical Sampling
  • Statistics

Readers

  • Adaptive Control and Estimation with Uncertainty in Dynamic Systems.
  • Life Cycle Cost Analysis