An Engineering Report in Civil Engineering and Management.

Abstract

For United States Naval Mobile Construction Battalions (NMBCs), the greatest challenge for construction operations is the effective utilization of project resources. NMCBs must develop plans for efficient use of labor, equipment and material resources during deployments to overseas construction sites. Of the three resources, material resources have the greatest degree of variability and uncertainty, and over which the battalion management personnel have the least control. Sound construction material resource planning is a must for the construction management effort. The importance of the material resource plan is also emphasized because of the nature and size of NMCB operations. A critical investigation is presented of the material resource plans recommended in Naval Construction Force directives and instructions. Also presented is an investigation into the actual operations and material resource plans employed by the active construction battalions during recent deployments. Recommendations for improvement to the material resource plans used by the NMCBs are discussed.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1987
Accession Number
ADA188015

Entities

People

  • Robert M. Carr

Organizations

  • Pennsylvania State University

Tags

Communities of Interest

  • Biomedical
  • C4I
  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Business Administration
  • Civil Engineering
  • Construction
  • Construction Materials
  • Employment
  • Engineers
  • Instructions
  • Logistics
  • Management Personnel
  • Marine Corps
  • Materials
  • Military Training
  • Organizational Structure
  • Personnel Management
  • Students
  • Supply Chain
  • United States

Readers

  • Industrial Economics
  • Logistics and Supply Chain Management.
  • Systems Analysis and Design