Repair Works for Uplift and Seepage control in Existing Concrete Dams.
Abstract
This second interim report presents a summary of the work done and of the administrative actions carried out in the period concerned, under the terms of the contract, as well as some comments of future work. The report will refer to each of the four main steps that were planned for the development of the work, namely: (1) Case histories on rock mass foundation deterioration of some Portuguese arch dams (R1); (2) Case histories on the hydromechanical behaviour of some Portuguese concrete gravity dam foundations (R2); (3) Modelling of the hydromechanical behaviour of concrete dam foundations (R3); and (4) Tests for deterioration evaluation and for analysis of repair works in concrete dam foundations (R4).
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1987
- Accession Number
- ADA191384
Entities
People
- Jose O. Pedro
Organizations
- Laboratório Nacional de Engenharia Civil