Phase 1 General Design Memorandum Dalton Lake Project, Conasauga River, Whitfield and Murray Counties, Georgia.

Abstract

Extensive investigations into the feasibility of numerous possible multipurpose project configurations and sites were conducted during this study. Detailed analyses of the modified plan for the original Dalton Lake site, and the reformulated plan for the Mitchell Bridge site, were both performed using data and evaluation methodologies which strongly favored economic feasibility. All economic evaluations of the considered multipurpose plans resulted in benefit-to-cost ratios far below unity (costs exceeded National Economic Developmental benefits). The results of analyses performed for the three major plans considered are shown in Table 24. In addition to the lack of economic feasibility demonstrated by these multipurpose plans, it is pertinent to point out that each would also result in significant adverse environmental impacts.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 01, 1987
Accession Number
ADA193164

Entities

People

  • Mathew M. Laws Iii

Organizations

  • Mobile District, U.S. Army Corps of Engineers

Tags

DTIC Thesaurus Topics

  • Birds
  • Business Administration
  • Control
  • Drainage Basins
  • Economic Development
  • Energy Production
  • Environmental Protection
  • Fish
  • Flood Control
  • Habitats
  • Natural Resources
  • Quality Control
  • Urban Areas
  • Water Quality
  • Water Resources
  • Water Supplies
  • Wildlife

Readers

  • Archaeological Resource Survey
  • Military History of the United States in the 20th Century.
  • Software Engineering