The P-3 Scheduling Support System (P-3 S3).

Abstract

A P-3 Scheduling Support System (P-3 S3) is a Management Information System (MIS) that was designed using structured techniques. Structured analysis was used to determine the functionality and data requirements. Computer Assisted Systems Engineering (CASE) tools were used to document the analysis and design. The system was designed to be implemented in dBase III Plus, a data base management tool developed by Ashton Tate. P-3 S3 is designed to run on a microcomputer with the MS-DOS operating system. It provides real-time access to historical data and provides suggested personnel assignments to the user. The design provides for faster flight schedule generation and prevention of conflicting schedule events. Keywords: software development; patrol squadrons; theses.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1988
Accession Number
ADA194824

Entities

People

  • William B. Anderson

Organizations

  • Naval Postgraduate School

Tags

Communities of Interest

  • C4I
  • Engineered Resilient Systems
  • Human Systems
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Application Software
  • Artificial Intelligence
  • California
  • Computer Programming
  • Computer Programs
  • Computers
  • Database Management Systems
  • Engineers
  • Flight Crews
  • Flight Training
  • Information Systems
  • Management Information Systems
  • Navy
  • Pilots
  • Software Development
  • Systems Engineering
  • Word Processors

Fields of Study

  • Engineering

Readers

  • Aerospace logistics and air mobility.
  • Computer Science.
  • Defense Acquisition Program Management