Genesee River Basin Study. Volume 1. Main Report.

Abstract

This feasibility report discusses plans considered under the Genesee River Basin Study Authority. Two of these plans--a multi-use reservoir at Stannards and modification to the existing Mt. Morris Dam and reservoir for multi-use including flood control, recreation, hydropower, and irrigation--were found not economically feasible for single-purpose flood control. The Federal Government therefore recommended no further Federal actions.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1988
Accession Number
ADA194985

Entities

Organizations

  • Buffalo District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Birds
  • Dielectric Gases
  • Drainage Basins
  • Environment
  • Environmental Protection
  • Fish
  • Flood Control
  • Gases
  • Groundwater
  • Habitats
  • Health Services
  • Law
  • Topography
  • Water Quality
  • Water Resources
  • Water Supplies
  • Wildlife

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Hydrologic Risk Analysis and Mitigation.
  • Systems Analysis and Design