Genesee River Basin Study. Volume 1. Main Report.
Abstract
This feasibility report discusses plans considered under the Genesee River Basin Study Authority. Two of these plans--a multi-use reservoir at Stannards and modification to the existing Mt. Morris Dam and reservoir for multi-use including flood control, recreation, hydropower, and irrigation--were found not economically feasible for single-purpose flood control. The Federal Government therefore recommended no further Federal actions.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1988
- Accession Number
- ADA194985
Entities
Organizations
- Buffalo District, U.S. Army Corps of Engineers