Compliance Testing of Grissom AFB Central Heating Plant Coal-Fired Boilers 3 and 4, Grissom AFB Indiana.

Abstract

At the request of HQ SAC/SGPB, compliance testing (particulate emissions) of coal-fired boilers 3 and 4 in the Grissom AFB central heating plant was performed on 18-23 Nov 1987. The survey was conducted to determine compliance with Indiana Administrative Code, Title 325--Air Pollution Control Board, Articles 5 and 6. Results indicate Boiler 3 met particulate standards while exhausting through the bypass stack, but failed to meet standards when exhausting through the scrubber stack. Boiler 4 met particulate standards when exhausting through both the bypass the scrubber stacks. Keywords: Compliance testing; Stack sampling; Stack emission(s); Grissom; Particulates; Garrison; Source emission testing; Boiler; Air pollution.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1988
Accession Number
ADA195220

Entities

People

  • James A. Garrison

Tags

Communities of Interest

  • Biomedical

DTIC Thesaurus Topics

  • Air Force
  • Air Pollution
  • Air Pollution Control Systems
  • Barometric Pressure
  • Computer Programs
  • Dew Point
  • Dielectric Gases
  • Environment
  • Environmental Protection
  • Flue Gases
  • Gas Meters
  • Liquids
  • Measurement
  • Performance Tests
  • Test Methods
  • Vapor Pressure
  • Water Vapor

Fields of Study

  • Engineering

Readers

  • Energy Conservation and Renewable Energy Engineering.
  • Environmental Engineering.
  • Environmental Remediation and Restoration.