Compliance Testing of Grissom AFB Central Heating Plant Coal-Fired Boilers 3 and 4, Grissom AFB Indiana.
Abstract
At the request of HQ SAC/SGPB, compliance testing (particulate emissions) of coal-fired boilers 3 and 4 in the Grissom AFB central heating plant was performed on 18-23 Nov 1987. The survey was conducted to determine compliance with Indiana Administrative Code, Title 325--Air Pollution Control Board, Articles 5 and 6. Results indicate Boiler 3 met particulate standards while exhausting through the bypass stack, but failed to meet standards when exhausting through the scrubber stack. Boiler 4 met particulate standards when exhausting through both the bypass the scrubber stacks. Keywords: Compliance testing; Stack sampling; Stack emission(s); Grissom; Particulates; Garrison; Source emission testing; Boiler; Air pollution.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1988
- Accession Number
- ADA195220
Entities
People
- James A. Garrison