Installation Restoration Program (IRP). Phase 2. Confirmation/Quantification. Stage 1. Buckley Air National Guard Base, Colorado.

Abstract

The Buckley ANGB Phase II, Stage I field evaluation of the IRP investigated five sites through drilling and sampling nine borings and four monitor wells. Bedrock and alluvial aquifers are of interest in the Buckley ANGB area, particularly since they both provide local and regional water supplies. The bedrock aquifers provide water for the base, but the shallower alluvial aquifers are used within a mile of the base boundaries. The alluvial aquifers, particularly the aquifer associated with East Toll Gate Creek, are vulnerable to contamination. Ground water contamination has been found at Buckley ANGB. Cadmium levels exceeded the primary drinking water standards at the landfill and oil pit zone. TDS, TOX, TOX, and phenolics were also elevated at this site. At Site FT-3, the soil is contaminated, as evidenced by a strong fuel odor and elevated TOX and TOC. Keywords: Waste disposal, Pollution, Hazardous wastes, Air Force facilities, Water wells, Ground water. (KT)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 21, 1986
Accession Number
ADA195525

Tags

Communities of Interest

  • Advanced Electronics
  • Biomedical
  • Counter WMD
  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Chemical Synthesis
  • Chemistry
  • Drinking Water
  • Environment
  • Environmental Health
  • Environmental Protection
  • Geography
  • Groundwater
  • Health Services
  • Materials Laboratories
  • Materials Science
  • Materials Testing
  • Medical Personnel
  • Personnel Management
  • Water Supplies

Fields of Study

  • Environmental science

Readers

  • Archaeological Resource Survey
  • Environmental Engineering
  • Groundwater Contamination Remediation.