Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1
Abstract
A Problem Confirmation Study was conducted at Burlington Air National Guard Base in Vermont. The study included two sites: Site 1, a former Fire Department training area/old landfill, and Site 2, a construction rubble landfill. Five new monitor wells were installed at Site 1. Groundwater samples were collected from the new monitor wells and from three existing monitor wells at Site 1, and surface water samples were collected from both sites. On the basis of water quality data collected in this investigation, both sites have been confirmed as potential sources of contamination. Recommendations have been made for monitoring at Site No. 2, and a site characterization study to assess the magnitude and extent of contamination at Site No. 1.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 28, 1986
- Accession Number
- ADA197435
Entities
Organizations
- Weston Solutions (United States)