Genesee River Basin Study. Volume 2. Supporting Documentation
Abstract
The Feasibility Report discusses plans considered under the Genesee River Basin Study Authority. Two of these plans: a multi-use reservoir at Standards and modification to the existing Mt. Morris Dam and reservoir for multi-use including flood control, recreation, hydropower, and irrigation. These plans were found not economically feasible for single-purpose flood control. The Federal Government therefore recommended no further Federal actions. Keywords: Hydrology, Hydraulics, Environmental coordination.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1988
- Accession Number
- ADA197479
Entities
Organizations
- Buffalo District, U.S. Army Corps of Engineers