WWII (World War II) Era Building Demolition and Renovation Cost Estimator (ESTER) 1.0 User's Manual

Abstract

Unit and system cost data associated with the renovation and repair of Army temporary wood frame buildings was incorporated into a user friendly computer program, ESTER. By using ESTER, the estimation procedure is standardized at the Installation level and calculation errors are minimized. Keywords: Temporary wood buildings, Repair, Remodeling, Cost estimates, World War 2.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jul 01, 1988
Accession Number
ADA197832

Entities

People

  • John J. Fittipaldi
  • Paul R. Skidmore

Organizations

  • Construction Engineering Research Laboratory

Tags

Communities of Interest

  • C4I
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Computer Programming
  • Computer Programs
  • Computers
  • Construction
  • Drops
  • Engineering
  • Engineers
  • Fibers
  • Materials Laboratories
  • Mechanical Equipment
  • Metals
  • Mineral Fibers
  • Operating Systems
  • Second World War
  • Stainless Steel
  • Standards
  • Storage

Fields of Study

  • Engineering

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Life Cycle Cost Analysis
  • Military History of the United States in the 20th Century.