Compliance Testing of Grissom AFB Central Heating Plant Coal-Fired Boilers 3 and 5, Grissom AFB, Indiana
Abstract
At the request of HQ SAC/SGPB, compliance testing (particulate Emissions) of coal-fired boilers 3 and 5 in the Grissom AFB Central Heating Plant was performed on 4-14 Mar 1988. The survey was conducted to determine compliance with Indiana Administrative Code, Title 325--Air Pollution Control Board, Articles 5 and 6. Results indicate that boilers 3 and 5 to met particulate standards while exhausting through the bypass stack.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1988
- Accession Number
- ADA198185
Entities
People
- James A. Garrison