Compliance Testing of Grissom AFB Central Heating Plant Coal-Fired Boilers 3 and 5, Grissom AFB, Indiana

Abstract

At the request of HQ SAC/SGPB, compliance testing (particulate Emissions) of coal-fired boilers 3 and 5 in the Grissom AFB Central Heating Plant was performed on 4-14 Mar 1988. The survey was conducted to determine compliance with Indiana Administrative Code, Title 325--Air Pollution Control Board, Articles 5 and 6. Results indicate that boilers 3 and 5 to met particulate standards while exhausting through the bypass stack.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1988
Accession Number
ADA198185

Entities

People

  • James A. Garrison

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Air Force
  • Air Pollution
  • Air Pollution Control Systems
  • Carbon Dioxide
  • Combustion
  • Computer Programs
  • Exhaust Gases
  • Filters
  • Flue Gases
  • Gas Flow
  • Heating Plants
  • Liquids
  • Measurement
  • Performance Tests
  • Static Pressure
  • Test And Evaluation
  • Test Methods

Readers

  • Defense Financial Management and Audit.
  • Energy Conservation and Renewable Energy Engineering.
  • Environmental Remediation and Restoration.