On Estimating the Cost of Support Equipment

Abstract

The research published here collected and analyzed data on peculiar ground support equipment and automated test equipment in an effort to obtain relationships for estimating the procurement costs of this equipment. Regression analysis was used to relate the costs of the equipment to the aircraft supported and to the characteristics of the equipment itself.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 01, 1988
Accession Number
ADA200451

Entities

People

  • Daniel B. Levine
  • Richard T. Cheslow
  • Stanley A. Horowitz

Organizations

  • Institute for Defense Analyses

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Abstracts
  • Air Force
  • Air Force Facilities
  • Aircraft Equipment
  • Aircrafts
  • Classification
  • Cost Analysis
  • Ground Support
  • Ground Support Equipment
  • Information Science
  • Logistics
  • Plastic Explosives
  • Procurement
  • Regression Analysis
  • Security
  • Statistics
  • Test Equipment

Readers

  • Computational Modeling and Simulation
  • Software Engineering