Installation Restoration Program. Phase 2. Confirmation/Quantification Stage 2, Moody Air Force Base, Georgia
Abstract
This Phase II, Stage 2 Installation Restoration Program Confirmation/ Quantification survey for Moody Air Force Base, Georgia investigated four sites: Site 1, Southwest Landfill; Site 2, an underground waste fuel storage area; Site 3, the flight line storm drainage outfall area; and, Site 4, the Moody AFB water supply well at the Grassy Pond annex. Sites 1 and 4 required additional investigation as a result of the Phase II, Stage 1 investigation conducted in 1985. Sites 2 and 3 were investigated for the first time during this Stage 2 effort. The scope of work consisted of conducting hydrogeologic investigations at sites 1 and 2, and water quality sampling and analyses at sites 1,2,3,4. Three deep (80 feet) wells and six shallow (30 feet) wells were installed around the perimeter of the Site 1 landfill. Seven temporary well points, one standard penetration test boring, and four shallow monitor wells (30 feet) were installed at the Site 2 waste fuel storage area. Groundwater quality samples were collected from all of the new wells at Site 1 and 2, from two of the existing monitor wells at the Site 1 landfill, and from Moody water supply well No. 7 near Site 1. Water level, organic vapor, and floating product thickness measurements were performed on the temporary well points at Site 2.
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 01, 1988
- Accession Number
- ADA204382