Compliance Testing of Eielson Air Force Base Central Heating and Power Plant, Coal Fired Boiler Number 3, Eielson Air Force Base, Alaska
Abstract
Compliance testing for particulate and visible emissions was conducted on coal-fired boiler No. 3 in the Eielson AFB Central Heat and Power Plant on 12-22 July 88. The survey was conducted as a requirement for renewal of Alaska Department of Environmental conservation Air Quality Control permit to operate 8331-AA001. Boiler No. 3 was tested at capacities of 100,000 lbs steam/ hr and 90,000 lbs stream/hr. Results indicate that boiler No. 3 passed the visible emissions standard, but failed the particulate emission standard. Keywords: Air pollution, Emission control, Smoke stacks, Sampling.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1988
- Accession Number
- ADA204505
Entities
People
- James A. Garrison