Santa Ana River Design Memorandum Number 1. Phase 2 GDM on the Santa Ana River Mainstem Including Santiago Creek. Volume 3. Lower Santa Ana River. Appendixes

Abstract

Contents: Geotechnical; Coastal Design; Sediment Transport Analysis; Recreation; Side Drain Tabulation (Storm Peak Discharges).

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1988
Accession Number
ADA204543

Entities

Organizations

  • Los Angeles District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Cyber
  • Ground and Sea Platforms
  • Human Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Birds
  • Chemistry
  • Coastal Engineering
  • Construction
  • Drainage Basins
  • Drops
  • Flood Control
  • Groundwater
  • Igneous Rocks
  • Lepidoptera
  • Mechanics
  • Ridges
  • Terrain
  • Test Methods
  • Topography
  • Two Dimensional
  • Water Resources

Readers

  • Defense Financial Management and Audit.
  • Hydrologic Risk Analysis and Mitigation.
  • Riverine Ecology