Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 5. Oak Street Dam

Abstract

The recommended plan for Oak street Drain consists of a concrete channel beginning at the existing Oak Street debris basin and extending over 3 miles to the confluence with Temescal Wash. The channel is designed to provide 100-year level of protection. Total project first cost is estimated at $20,652, 000. The economic data for the project is contained in Volume 9, 'Economics and Public Comment and Response.'

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1988
Accession Number
ADA204546

Entities

Organizations

  • Los Angeles District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • Biomedical
  • Human Systems

DTIC Thesaurus Topics

  • Construction
  • Drainage Basins
  • Embankments
  • Employment
  • Engineers
  • Environment
  • Flood Control
  • Froude Number
  • Groundwater
  • Nuclear Materials
  • Personnel Management
  • Pipes
  • Plastic Explosives
  • Structural Loads
  • Topography
  • United States
  • Water Resources

Readers

  • Hydraulic Engineering.
  • Library and Information Science
  • Riverine Ecology