Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 7. Hydrology

Abstract

This volume contains hydrologic information in support of the general design consideration for Seven Oaks Dam, Prado Dam, Santa Ana River mainstem between Seven Oaks Dam and Prado Dam, Mill Creek levee, Oak street Drain, Santiago Creek, and lower Santa Ana River.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1988
Accession Number
ADA204547

Entities

Organizations

  • Los Angeles District, U.S. Army Corps of Engineers

Tags

Communities of Interest

  • C4I
  • Energy and Power Technologies
  • Human Systems
  • Sensors

DTIC Thesaurus Topics

  • Construction
  • Drainage Basins
  • Engineers
  • Environment
  • Environmental Protection
  • Flood Control
  • Floods
  • Groundwater
  • Habitats
  • Losses
  • Plastic Explosives
  • Runoff
  • Telemetry Equipment
  • Topography
  • Water Conservation
  • Water Resources
  • Water Supplies

Readers

  • Archaeological Resource Survey
  • Hydraulic Engineering.
  • Hydrologic Risk Analysis and Mitigation.