Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 7. Hydrology
Abstract
This volume contains hydrologic information in support of the general design consideration for Seven Oaks Dam, Prado Dam, Santa Ana River mainstem between Seven Oaks Dam and Prado Dam, Mill Creek levee, Oak street Drain, Santiago Creek, and lower Santa Ana River.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1988
- Accession Number
- ADA204547
Entities
Organizations
- Los Angeles District, U.S. Army Corps of Engineers