Industrial Technology Modernization Program. Phase 3 Proposal, Category 1 Project Countermeasures Assembly Improvements

Abstract

This project will improve material handling, kitting set-up, and product flow where provided in the assembly of countermeasures systems. The improved assembly system will relocate the stockroom, provide work-station portable carts, facility layout and new revised assembly fixtures. Training of personnel in the use of application of improved techniques and methods. Keywords: Countermeasures Assembly, Industrial production.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 24, 1985
Accession Number
ADA208940

Entities

People

  • Russ Petrie

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Space

DTIC Thesaurus Topics

  • Air Force Facilities
  • Assembly
  • Contract Administration
  • Contractors
  • Contracts
  • Control Systems
  • Control Systems Engineering
  • Engineering
  • Engineers
  • Industrial Engineering
  • Laser Diodes
  • Manufacturing
  • Organizational Structure
  • Plastic Explosives
  • Production
  • Standards
  • Systems Engineering

Fields of Study

  • Engineering

Readers

  • Aerospace Test and Evaluation
  • Electrical Engineering
  • Military Training and Readiness Simulation