Industrial Technology Modernization Program. Project 88. Improve Material Handling, Computerized Storage/Retrieval System (CS/RS). Revision 1. Phase 2
Abstract
This project addresses the modernization of the factory layout of the electronic chassis, transformer, and epoxy production areas. This is to be accomplished through more efficient use of floor space, utilization of automated storage and retrieval systems, streamlining work flow, and installation of ergonomically designed work cell/work centers. Incorporation of these changes will result in increased productivity and yields from a reduction in rework, training, and throughput time. Keywords: Transformer manufacture, Electronic chassis manufacture, VS/RS, Ergonomic work stations.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 01, 1988
- Accession Number
- ADA209164
Entities
People
- Robert Knox
Organizations
- General Dynamics