Industrial Technology Modernization Program. Project 7. Part Forming and Tinning (Surface Component Preparation). Phase 2

Abstract

The proposed forming and tinning station will be fully automated, requiring only one operator to load and unload magazines and to oversee the station to ensure proper functions. The forming and tinning machine will prepare both leadless chip carriers (LCCs) and leaded flat packs by removing parts from incoming carriers, forming, tinning and replacing the parts in carriers and reassembling the carriers into magazines. Keywords: Machine parts, Manufacturing, Production.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 28, 1987
Accession Number
ADA209611

Entities

Organizations

  • General Dynamics

Tags

Communities of Interest

  • Advanced Electronics
  • Human Systems
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Abstracts
  • Accuracy
  • Assembly
  • California
  • Classification
  • Commercial Equipment
  • Contractors
  • Contracts
  • Corporations
  • Cost Benefit Analysis
  • Electronics
  • Engineering
  • Fabrication
  • Manufacturing
  • Periodicals
  • Production Engineering
  • Standards

Readers

  • Defense Acquisition Program Management
  • Electrical Engineering
  • Thin Film Deposition Science.