Selection and Evaluation of a Real Time Monitoring System for the Bigeye Bomb Fill/Close Production Facility. Phase 2
Abstract
From April 1985 through August 1986, detection studies for a monitoring system for Phase II Binary facilities were conducted. This project was to provide the technical information for effectively monitoring the workplace for personal protection in the Phase II production facilities. The contractors for the ethyl-2-diisopropylaminoethyl-methylphosphonite (QL) production facility and the Bigeye fill/close facility have the overall responsibility for design, construction, and prove-outs of these facilities and subsequent production, including detection and monitoring. This effort, which was sponsored by the Munitions Directorate and technically evaluated by Research Directorate, was directed by Detection Directorate's Development Division Chairman, who headed a committee of representatives of the major activities of the U.S. Army Chemical Research, Development and Engineering Center, specifically assembled for this purpose. Keywords: Bigeye bomb; Binary facility.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1989
- Accession Number
- ADA211535
Entities
People
- Foy E. Ferguson
- Joseph W. Lovrich
- Michael W. Ellzy
- Theodore L. Strozyk Jr