Compliance Testing of Eielson AFB Central Heating and Power Plant, Coal-Fired Boiler Number 4, Eielson AFB, Arkansas
Abstract
At the request of HQ 343 CSG/DEEV and HQ AAC/SGPB, source compliance testing (particulate and visible emissions) of Boiler No 4 in the Eielson AFB central Heating and Power Plant was conducted on 7-15 June 1989. Testing was performed to determine compliance with regards to the renewal of Alaska Department of Environmental Conservation Air Quality Control Permit to Operate 8331-AA001. Boiler No. 4 was tested on 12 and 14 Jun 89. On 12 June results indicated that visible emissions standards were met; however, particulate emissions standards were not met. The boiler was retested on 14 June and all emissions standards were met. All emission requirements for permit renewal have now been met. Keywords: Compliance testing; Stack sampling; Stack emissions; Particulates; Source emission testing, Opacity; Air pollution. (jes)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1989
- Accession Number
- ADA213001
Entities
People
- James A. Garrison