Study/Services Site Preparation Guide. Cargo Movement Operations System (CMOS)

Abstract

This product provides site preparation guidance to base-level Cargo Movement Operations System (CMOS) managers. It is intended to assist them in performing the site survey and prepare a Program Support Agreement (PSA). The PSA contains the support required to implement CMOS and the concurrences from Base Civil Engineers and the base comm squadron that they will support the requirements stated in the PSA. Keywords: Military transportation, Airlift operations, Planning programming budgeting, Logistics support, Civil engineering, Communication equipment.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Sep 22, 1989
Accession Number
ADA213261

Tags

Communities of Interest

  • Advanced Electronics

DTIC Thesaurus Topics

  • Air Conditioning
  • Airlift Operations
  • Civil Engineering
  • Computer Programming
  • Computers
  • Control Systems
  • Engineering
  • Engineers
  • Fire Extinguishers
  • Fire Protection
  • Host Computers
  • Local Area Networks
  • Plastic Explosives
  • Program Management
  • Telephone Lines
  • Test And Evaluation
  • Uninterruptible Power Supplies

Fields of Study

  • Engineering

Readers

  • Computer Science.
  • Environmental Remediation and Restoration.
  • Logistics and Supply Chain Management.