Puget Sound Dredged Disposal Analysis (PSDDA). Final Environmental Impact Statement Unconfined Open-Water Disposal for Dredged Material, Phase 2. (North and South Puget Sound)
Abstract
This final environmental impact statement (FEIS) evaluates alternatives considered in identifying preferred sites for disposal of dredged material in north and south Puget Sound (Phase II area of the PSDDA study shown in figure 1). Five public multiuser disposal sites (Anderson Island/Ketron Island, Bellingham Bay, Port Townsend, Port Angeles, and Rosario Strait) are identified for use based on a site selection process considering alternative locations. Previous Environmental Documents Adopted by Reference. The Phase II Disposal Site Selection Appendix and Management Plan Report are adopted by reference as part of this FEIS as are the PSDDA Phase I FEIS, Management Plan Report, Disposal Site Selection Technical Appendix, Evaluation Procedures Technical Appendix, and Management Plan Technical Appendix. These documents are available from the Corps of Engineers, Seattle District.
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 01, 1989
- Accession Number
- ADA213397
Entities
Organizations
- United States Army Corps of Engineers