Proposed Activities to Prepare for Testing Advanced/Stealth Weapons Systems
Abstract
The B-2 brings new challenges for Electromagnetic Pulse (EMP) testing. This paper discusses the unique characteristics of the B-2 and develops a time line of activities that need to be completed by the AF Weapons Laboratory before EMP testing of the B-2 begins. Keywords: Electromagnetic pulse simulators; Jet bombers; Stealth hardness; Testing; Electromagnetic pulse; Trestle; Norms.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 01, 1989
- Accession Number
- ADA214453
Entities
People
- H. T. Bishop