Study/Services Installation/Implementation Schedule Analysis

Abstract

This report was initiated to develop an up-to-date base line installation/implementation schedule upon which CMOS-related activities can be planned. It includes all known additions, deletions, and changes and discusses two separate schedules. The first is developed to depict the logistical constraints imposed by the Government, and the second set applies travel and work restrictions to determine optimal supportability. The installation and implementation schedule for CMOS should continue to be revised as conditions warrant. Factors, such as base closures, limits on fiscal year spending, equipment lead times, overseas host country requirements, and Air Force installation priorities, may force a reevaluation and adjustment of the installation schedule. Additionally, when installation begins at the ADAM-3 sites, a reevaluation and readjustment of the schedule may again be necessary.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Nov 16, 1989
Accession Number
ADA214842

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Base Closures
  • Diego Garcia
  • Gantt Charts
  • Governments
  • Infrastructure
  • Lead Time
  • Naval Air Stations
  • Overseas
  • Radio Stations
  • Rods
  • Scheduling (Production)
  • Sequences
  • Standards
  • Travel Time
  • United States

Readers

  • Aerospace logistics and air mobility.
  • Computer Science.
  • Systems Analysis and Design