Saugus River and Tributaries, Lynn Malden, Revere and Saugus, Massachusetts. Flood Damage Reduction. Volume 3. Appendix D. Design and Costs. Appendix E. Geotechnical. Appendix F. Real Estate
Abstract
This volume consists of three appendices to the main report and environmental impact statement/report. Appendix D includes: detailed descriptions, plans and profiles and design considerations of the selected plan; coastal analysis of the shorefront; detailed project costs; scope and costs of engineering and design; scope and costs of operation and maintenance; and design and construction schedules. Appendix E describes geotechnical and foundation conditions in the study area and the design of earth embankment structures in the selected plan. Appendix F describes lands and damages, temporary and permanent easements and costs of the selected plan, including the five floodgate alignments studied. (edc)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1989
- Accession Number
- ADA217041
Entities
People
- Robert F Hunt
Organizations
- New England District, U.S. Army Corps of Engineers