Abstract
This appendix discusses the Corps of Engineers' responses to the Public Review of the Draft Feasibility Report, Environmental Impact Statement and Environmental Impact Report (EIS/EIR) various project revisions; General and Specific responses to the individual comments and the comment letters themselves. This appendix includes all project changes, no other appendices were revised. Public involvement efforts have been underway throughout the study with opinions on the project and its alternatives elicited from the general public, elected officials at the State and community level and Federal and State agencies concerned with water resources development. In June 1989 that involvement was extended through distribution of 500 copies of the draft Feasibility Report and EIS/EIR. Several features of the project were revised primarily in response to comments received. These include: Method for Protection of Estuary Storage Capacity, Lynn Harbor Shorefront, The Floodgate Structure, Point of Pines Structures;,Mitigation Site Location. Keywords: Flood control; Environmental protection; Public safety.
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 01, 1989
- Accession Number
- ADA217045
Entities
People
- Robert F Hunt
Organizations
- New England District, U.S. Army Corps of Engineers