Site Preparation Guide: Increment 1 and Increment 2. Cargo Movement Operations System (CMOS). Revision
Abstract
The purpose of this guide is to provide information to assist MAJCOM/ Base personnel involved in conducting site surveys, preparing Program Support Agreements (PSA), and determining facility preparation requirements for the Cargo Movement Operations System (CMOS). The guide also familiarizes site survey and facility preparation personnel with CMOS. Additionally, it identifies the activities and responsibilities associated with providing adequate facilities and a local area network (LAN) for the CMOS program.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 01, 1990
- Accession Number
- ADA218526