The Enhanced Engineer Module of the Vector-in-Commander (VIC) Battle Simulation
Abstract
This report documents the enhancements made by the U.S. Army Construction Engineering Research Laboratory to the Vector-in-Commander (VIC) battle simulation during the first half of the VIC-EFAM portion of the Engineer Model Improvement Program (EMIP). The engineer module of VIC Version 2.0 has been completely redesigned and coded. This report describes the methodology, data structures, and input data requirements, summarizes routines and events, and presents a calling tree for the engineer module. Keywords: Vector-in- commander, Military engineers, Division level organizations, Army personnel, Command and control systems, Computerized simulation.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1990
- Accession Number
- ADA218591
Entities
People
- Carol Subick
Organizations
- Construction Engineering Research Laboratory