Advanced on-the-Job Training System: Readiness Test Plan

Abstract

The Readiness Test provided critical information which was the basis for the determination that the Advanced On-the-job Training System (AOTS) was ready for installation in the AOTS work centers and initiation of the 1-year AOTS System Level Test and Evaluation (SLT&E). The test prescribes procedures to verify that the 'critical' functions are operating before the software progresses to summative evaluations envisioned in the operational Active Duty, Air Force Reserve, and Air National Guard work centers. Readiness Testing was not an exhaustive test of the AOTS functionality. Instead, it tested the small subset of AOTS functions which were essential to the usability of the software in the AOTS work centers. Keywords: Advanced on the job training system, Software readiness test plan.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1990
Accession Number
ADA222377

Entities

People

  • James C West
  • John J. O'connor

Tags

DTIC Thesaurus Topics

  • Active Duty
  • Air Force
  • Air Force Facilities
  • Computer Access Control
  • Computer Programs
  • Computers
  • Contracts
  • Databases
  • Engineering
  • Governments
  • Human Resources
  • Job Training
  • Management Personnel
  • Personnel Management
  • Systems Engineering
  • Test And Evaluation
  • Trainees

Readers

  • Instructional Design and Training Evaluation.
  • Military Mobilization and Reserve Forces Studies.