Abstract

One of the most vexing situations encountered by an army on the move in winter is the need to cross an ice-covered river. If this ice cover is not thick enough to support the anticipated loads, yet is thicker than what can be easily removed (less than 8 in.), the problem becomes very difficult. This report describes a winter bridging exercise undertaken by CRREl and the 2nd Combat Engineer Battalion, 2nd Marine Division FMF. The exercise investigated the difficulties of bridging a waterway with 24-in thick ice present and experimented with some options that were chosen to be compatible with equipment normally found with a Ribbon Bridge unit. The only special equipment or materials considered were those that could be easily fabricated or procured if found effective. Keywords: Winter warfare; Military bridges; Ice breakup.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 01, 1990
Accession Number
ADA223682

Entities

People

  • Barry Coutermarsh

Organizations

  • Cold Regions Research and Engineering Laboratory

Tags

DTIC Thesaurus Topics

  • Abstracts
  • Army Corps Of Engineers
  • Bearing Capacity
  • Bridges
  • Bulldozers
  • Cold Regions
  • Combat Support
  • Crossings
  • Deployment
  • Engineering
  • Engineers
  • Glaciers
  • Regions
  • Thickness
  • Vehicles
  • Warfare
  • Waterways

Readers

  • Geotechnical Engineering.
  • Military Science
  • Systems Analysis and Design