Cargo Movement Operations System (CMOS). Increment II System Design Document, Final
Abstract
The purpose of this Technical Report is to review the Increment II system Segment Design Document, Final, CDRL A002-06, which was produced for the Government by Evaluation Research Corporation. The results are provided in the form of Data Item Discrepancy worksheets as requested by the CMOS Program Office.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 02, 1990
- Accession Number
- ADA225156
Entities
Organizations
- Leidos