Advanced On-the-Job Training System: Master Test Plan

Abstract

The advanced On-the-job Training System (AOTS) was an Air-Staff- directed, AFHRL-developed prototype which designed, developed, and tested a proof-of-concept prototype AOTS within the operational environment of selected work centers a Bergstrom AFB Texas, and Ellington ANGB, Texas, from August 1985 through 31 July 1989. The Master Test Plan is synonymous with program evaluation and consists of a plan to evaluate AOTS with regard to assessment of the four critical issues of system compliance, acceptance, performance and suitability. Within the MTP, these critical issues are assessed at subcomponent, component, and subsystem levels.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
May 01, 1990
Accession Number
ADA225873

Entities

Organizations

  • Douglas

Tags

Communities of Interest

  • Biomedical
  • Human Systems
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Beta Testing
  • Computer Programming
  • Computer Programs
  • Computers
  • Control Systems
  • Data Analysis
  • Databases
  • Debugging
  • Maintenance
  • Software Development
  • Software Testing
  • Test And Evaluation
  • Test Management
  • Test Methods
  • Training Management

Readers

  • Aerospace Test and Evaluation
  • Climatology
  • Instructional Design and Training Evaluation.