Installation Restoration Program. Records Search, Bolling AFB, Washington, DC. Phase 1
Abstract
Conclusions have been developed based on the results of the project team field inspection, reviews of base records and files, interviews with base personnel, and evaluations using the HARM system. All three sites rated were found to have sufficient potential to create environmental contamination. These sites are: Heating plant oil leak, Fire protection training area, and Landfill No. 1.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1985
- Accession Number
- ADA227130