Upper Mississippi River System Environmental Management Program, Definite Project Report (R-6F) with Integrated Environmental Assessment (R-6F), Peoria Lake Enhancement, Peoria Pool, Illinois Waterway, River Miles 178.5 to 181, State of Illinois. Technical Appendices
Abstract
Contents: Hydrodynamic analysis of Peoria Lake for environmental management program; Hydrology and hydraulics for forested wetland management area; Design for construction of Peoria Lake barrier island and East River dredged material placement; Geotechnical considerations for forested wetland management area; Water quality; Natural resources design, monitoring, and management recommendations for the Peoria Lake Restoration Project; Habitat assessment and quantification; Habitat inventories; Structural considerations; and Pump station mechanical and electrical considerations. (EDC)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1990
- Accession Number
- ADA227459
Entities
Organizations
- Rock Island District, U.S. Army Corps of Engineers