Aircraft Operations on Repaired Runways (l'Exploitation des Aeronefs sur les Pistes Refaites)

Abstract

This report presents the results of an AGARD Working Group, (WG.22) directed by the Structures and Materials Panel. The Working Group was tasked to develop design requirements and qualification methods the application of which, across NATO, would improve aircraft utilization and interoperability. This report, develops and illustrates the subject of repaired-runway operation; its sections reflect the various aims of the Working Group while the appendices amplify particular aspects. Throughout, topics are discussed from fundamentals so that it may provide an introduction to the structural and dynamical implications of repaired-runway operation as well as a statement of the current level of development of techniques in design, assessment and operational clearance. The publication was sponsored by the Structures and Materials Panel of AGARD. (sdw)

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 01, 1990
Accession Number
ADA228898

Entities

Organizations

  • AGARD

Tags

Communities of Interest

  • Air Platforms
  • Engineered Resilient Systems
  • Weapons Technologies

DTIC Thesaurus Topics

  • Accuracy
  • Aircrafts
  • Airframes
  • Chemical Warfare Agents
  • Dynamic Response
  • Landing Gear
  • Materials Testing
  • Mathematical Models
  • Measurement
  • Military Aircraft
  • Nose Wheels
  • Recording Systems
  • Test And Evaluation
  • Test Equipment
  • Test Facilities
  • Test Methods
  • Transport Aircraft

Readers

  • Business Analytics
  • Joint Military Operations and Doctrine.
  • Small Business Innovation Research Program (SBIR) EDI Research and Innovation.