Detailed Project Report and Environmental Impact Statement, Limestone Creek Manlius, New York
Abstract
The recommended plan provides a 100 year level of protection along the main branch of Limestone Creek in the village of Manlius. The project calls for channelization of the existing Main Branch, excavation of a diversion channel (to be used only for high flows), and the lining of the diversion and portions of the natural channel in fabric formed concrete. A new bridge over the Main Branch of Limestone Creek would be constructed to eliminate the constriction of flows under Route 173. (MM)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1990
- Accession Number
- ADA229694
Entities
Organizations
- Buffalo District, U.S. Army Corps of Engineers