Installation Restoration Program. Idaho Air National Guard, Gowen Field, Boise, Idaho, Site Inspection Report. Volume 2
Abstract
Partial contents of Volume II of this report include Appendices A through K. Field tests were conducted to determine chemical contamination of soils, ground water, aquifers and surface water. Data (primarily in the form of data tables) obtained from test results are presented. Quality control and public health are discussed.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 21, 1989
- Accession Number
- ADA231702
Entities
Organizations
- Leidos